Skip to content

Merge pull request #15 from pelotoncycle/dan.update_dag_factory #143

Merge pull request #15 from pelotoncycle/dan.update_dag_factory

Merge pull request #15 from pelotoncycle/dan.update_dag_factory #143

Triggered via push March 6, 2024 15:12
Status Failure
Total duration 40s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 7 warnings
build (3.8)
Docker build failed with exit code 1
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
Docker build failed with exit code 1
build (3.7)
The job was canceled because "_3_8" failed.
build (3.7)
The operation was canceled.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
The operation was canceled.
build (3.8)
Docker build failed with exit code 1, back off 6.182 seconds before retry.
build (3.8)
Docker build failed with exit code 1, back off 2.302 seconds before retry.
build (3.10)
Docker build failed with exit code 1, back off 4.573 seconds before retry.
build (3.10)
Docker build failed with exit code 1, back off 4.593 seconds before retry.
build (3.7)
Docker build failed with exit code 1, back off 8.949 seconds before retry.
build (3.7)
Docker build failed with exit code 1, back off 3.581 seconds before retry.
build (3.9)
Docker build failed with exit code 1, back off 7.923 seconds before retry.