Skip to content

Commit

Permalink
Add workflow for validating schema changes
Browse files Browse the repository at this point in the history
  • Loading branch information
optionsome committed Jan 20, 2025
1 parent 1030408 commit b147b21
Showing 1 changed file with 37 additions and 0 deletions.
37 changes: 37 additions & 0 deletions .github/workflows/schema-validation.yml
Original file line number Diff line number Diff line change
@@ -0,0 +1,37 @@
name: Validate schema changes

on:
pull_request:
branches:
- dev-2.x

jobs:
validate-gtfs:
if: github.repository_owner == 'opentripplanner'
name: Validate GraphQL schema changes
runs-on: ubuntu-latest

steps:
- name: Checkout
uses: actions/checkout@v4

- name: 'Fetch dev.2.x for diffing'
run: |
git fetch origin dev-2.x --depth 1
- uses: actions/setup-node@v4
with:
node-version: 22

- name: Install GraphQL Inspector
run: |
npm i --global @graphql-inspector/ci graphql @graphql-inspector/diff-command @graphql-inspector/graphql-loader @graphql-inspector/git-loader
- name: Validate GTFS GraphQL schema changes
run: |
graphql-inspector diff 'git:origin/dev.2.x:application/src/main/resources/org/opentripplanner/apis/gtfs/schema.graphqls' 'application/src/main/resources/org/opentripplanner/apis/gtfs/schema.graphqls'
- name: Validate Transmodel GraphQL schema changes
run: |
graphql-inspector diff 'git:origin/dev.2.x:application/src/main/resources/org/opentripplanner/apis/transmodel/schema.graphql' 'application/src/main/resources/org/opentripplanner/apis/transmodel/schema.graphql'

0 comments on commit b147b21

Please sign in to comment.