Skip to content

Update ruff requirement from 0.3.0 to 0.4.1 #321

Update ruff requirement from 0.3.0 to 0.4.1

Update ruff requirement from 0.3.0 to 0.4.1 #321

Triggered via pull request April 19, 2024 15:49
Status Failure
Total duration 50s
Artifacts

test.yml

on: pull_request
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Test (3.9)
Process completed with exit code 2.
Test (3.12)
Process completed with exit code 2.
Test (3.8)
Process completed with exit code 2.
Test (3.11)
The job was canceled because "_3_9" failed.
Test (3.11)
Process completed with exit code 2.
Test (3.10)
The job was canceled because "_3_9" failed.
Test (3.10)
Process completed with exit code 2.