[refactor] #4315: split pipeline events #9016
iroha2-dev-pr.yml
on: pull_request
consistency
2m 27s
with_coverage
1m 28s
integration
2m 10s
unstable
1m 54s
pr-generator-build
0s
client-cli-tests
2m 0s
Annotations
11 errors
client-cli-tests
Process completed with exit code 101.
|
consistency
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/4366/merge' exists
|
consistency
Process completed with exit code 101.
|
consistency
Process completed with exit code 1.
|
consistency
Process completed with exit code 1.
|
with_coverage
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/4366/merge' exists
|
with_coverage
The operation was canceled.
|
integration
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/4366/merge' exists
|
integration
The operation was canceled.
|
unstable
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/4366/merge' exists
|
unstable
The operation was canceled.
|