[refactor] #4315: split pipeline events #9004
iroha2-dev-pr.yml
on: pull_request
consistency
3m 12s
with_coverage
4m 21s
integration
5m 0s
unstable
4m 55s
pr-generator-build
0s
client-cli-tests
5m 27s
Annotations
8 errors
consistency
Process completed with exit code 1.
|
client-cli-tests
Process completed with exit code 101.
|
unstable
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/4366/merge' exists
|
unstable
The operation was canceled.
|
integration
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/4366/merge' exists
|
integration
The operation was canceled.
|
with_coverage
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/4366/merge' exists
|
with_coverage
The operation was canceled.
|