chore(deps): bump the deps group across 2 directories with 3 updates #11165
Triggered via pull request
October 14, 2024 16:33
Status
Failure
Total duration
1h 18m 26s
Artifacts
3
iroha2-dev-pr.yml
on: pull_request
build_wasm_samples
15m 41s
consistency
2m 44s
fmt_and_clippy
13m 23s
pr-generator-build
0s
unit_tests_with_coverage
17m 11s
integration
13m 45s
extra_functional
1h 0m
docker-compose-and-pytests
15m 59s
Annotations
4 errors and 1 warning
fmt_and_clippy
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
fmt_and_clippy
The operation was canceled.
|
extra_functional
The job running on runner i-04f164d6314b044f9 has exceeded the maximum execution time of 60 minutes.
|
extra_functional
The operation was canceled.
|
docker-compose-and-pytests
Attestations are only supported by buildx >= 0.10.0; the inputs 'attests', 'provenance' and 'sbom' are ignored.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
executor.wasm
Expired
|
125 KB |
|
report-coverage
Expired
|
1.13 MB |
|
wasm_samples
Expired
|
1.74 MB |
|