Skip to content

Fix require in test helper #17

Fix require in test helper

Fix require in test helper #17

Triggered via push June 10, 2024 16:51
Status Failure
Total duration 1m 7s
Billable time 5m
Artifacts

ci.yml

on: push
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Tests (3.0)
Process completed with exit code 1.
Tests (2.7)
The job was canceled because "_3_0" failed.
Tests (2.7)
The operation was canceled.
Tests (3.1)
The job was canceled because "_3_0" failed.
Tests (3.1)
The operation was canceled.
Tests (3.3)
The job was canceled because "_3_0" failed.
Tests (3.3)
The operation was canceled.
Tests (3.2)
The job was canceled because "_3_0" failed.
Tests (3.2)
The operation was canceled.