Skip to content

Commit

Permalink
doc/developer: minor patches to project management (#24998)
Browse files Browse the repository at this point in the history
---------

Co-authored-by: Nikhil Benesch <[email protected]>
  • Loading branch information
morsapaes and benesch authored Feb 16, 2024
1 parent 10b13b3 commit 1a7ce63
Showing 1 changed file with 7 additions and 7 deletions.
14 changes: 7 additions & 7 deletions doc/developer/project-management.md
Original file line number Diff line number Diff line change
Expand Up @@ -2,11 +2,11 @@

At Materialize, we have a
[unified Engineering, Product, Design (EPD) backlog](https://github.com/orgs/MaterializeInc/projects/43).
The backlog describes all prioritized projects across our EPD teams,
including: Product Teams, Functional Teams, Product Design, Developer
Experience, Education, and Analytics. Each roadmap item is marked with
a priority ("Now," "Next," or "Later") that indicates the timeline upon
which the item will be picked up, worked on, and eventually delivered.
The backlog describes all prioritized projects across our EPD teams, including:
Product Teams, Functional Teams, Product Design, and Analytics. Each roadmap
item is marked with a priority ("Now," "Next," or "Later") that indicates the
timeline upon which the item will be picked up, worked on, and eventually
delivered.

Each project marked "Now" must be owned by a single Directly Responsible
Individual (DRI). The DRI for a project can be any member of the larger
Expand Down Expand Up @@ -98,7 +98,7 @@ skipping this step in the GitHub Epic.
Otherwise, the DRI is responsible for researching the solution space,
proposing potential solutions, and getting signoff from relevant stakeholders.
This does not mean that the DRI is required to convince everyone of their chosen
solution, we do not intend to design by committee. If you are the DRI for a
solution we do not intend to design by committee. If you are the DRI for a
project and need help identifying your relevant stakeholders, please reach
out to your manager.

Expand All @@ -111,7 +111,7 @@ from Internal Development to General Availability.

It is not required that the DRI personally deliver each piece
of work attached to a project. The DRI will likely require help from a
Product Manager, a Product Designer, Engineers, and our DevEx and GTM
Product Manager, a Product Designer, Engineers, and our testing and GTM
teams along the way. The DRI is responsible for assigning each piece of
work attached to a project, and ensuring that progress is moving along
as expected.
Expand Down

0 comments on commit 1a7ce63

Please sign in to comment.