You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I've upgraded Semaphore to version 2.11.2 and I have noticed that "Next Run" in scheduled tasks is displayed incorrectly.
Today's day is sunday, at 6 PM, both the host and docker container has the correct date and time set.
Cron is scheduled to friday at 10 PM, but Semaphore seems to want to run the scheduled task in 18 hours:
It's not suppose to run before 5 days and 4 hours..
I have another scheduled task that is suppose to run every night at midnight, but Semaphore want to run it in 18 hours, and not in 6 hours, like it's suppose to, because of the current date and time, as mentioned above. 18 hours is at 1:00 in the afternoon:
Issue
I've upgraded Semaphore to version 2.11.2 and I have noticed that "Next Run" in scheduled tasks is displayed incorrectly.
Today's day is sunday, at 6 PM, both the host and docker container has the correct date and time set.
Cron is scheduled to friday at 10 PM, but Semaphore seems to want to run the scheduled task in 18 hours:
It's not suppose to run before 5 days and 4 hours..
I have another scheduled task that is suppose to run every night at midnight, but Semaphore want to run it in 18 hours, and not in 6 hours, like it's suppose to, because of the current date and time, as mentioned above. 18 hours is at 1:00 in the afternoon:
Impact
Web-Frontend (what users interact with)
Installation method
Docker
Database
MySQL
Browser
Firefox
Semaphore Version
2.11.2
Ansible Version
Logs & errors
No response
Manual installation - system information
Linux 6.8.12-5-pve SMP PREEMPT_DYNAMIC PMX 6.8.12-5 (2024-12-03T10:26Z) x86_64 Linux
Configuration
No response
Additional information
No response
The text was updated successfully, but these errors were encountered: