You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The next step is to re-identify the plant model for ZPos(altitude) control.
I plan to finish that by using the PID tune APP (refer to the webinar from Mathworks).
So the ZPos plant transfer function is: 0.99217/s/(0.2486*s+1).
The text was updated successfully, but these errors were encountered:
The next step is to re-identify the plant model for ZPos(altitude) control.
I plan to finish that by using the PID tune APP (refer to the webinar from Mathworks).
So the ZPos plant transfer function is: 0.99217/s/(0.2486*s+1).
The text was updated successfully, but these errors were encountered: