There are several levels at which our work is being of organized and tracked. We're using Issues and Milestones to complete our Project. Below is an outline:
- Link: https://github.com/CodeForPhilly/prevention-point/issues
-
Description: Issues are tasks that can be accomplished by an individual contributing to the project. Multiple Issues make up a Milestone
- Issues are akin to stories or tasks for those used to working with agile development methods or other project management platforms, such as JIRA
- Every issue will have a tag indicating which team owns it: backend, frontend, product owner, or UX
- Link: https://github.com/CodeForPhilly/prevention-point/milestones
-
Description: Milestones are made of multiple Issues and represent individual components of the overall Prevention Point System. Once complete, that component should be fully functional. Each Milestone has a corresponding tag, which can be viewed in the Project Board. For example, there is a Milestone for the Login Page, as well as a pink tag called "login page" (check it out here!)
- Milestones are akin to epics for those used to working with agile development methods or other project management platforms, such as JIRA
-
Owners: Each Milestone will have at least 4 key Issues, representing a contribution from different team functions. These are outlined below and have corresponding tags on each Issue, so the Issue owner can be easily identified
- Product Owner: Should include the user story and acceptance criteria. This will serve as a reference for sign off on completion of the Milestone
- UX: Should include any mocks needed to complete the milestone
- Frontend: Front end issues will be broken out based on the user story and UX, so that an Engineer can build the front end component of the Milestone
- Backend: Front end issues will be broken out based on the user story and UX, so that an Engineer can build the front end component of the Milestone
- Link: https://github.com/CodeForPhilly/prevention-point/projects/1
- Description: From here you can see all of the issues the team is working on, and the status of each (To Do, In Progress, PR Review, and Done)